Bartlett Cocke General
Contractors realizes the critical importance of the
closeout and commissioning process and how it can affect
the overall
success of a construction project. We work with owners
and design professionals to effectively manage the closeout
and commissioning
process and to ensure fulfillment of all regulatory
requirements for a
complete and operational building. We provide a complete
closeout and
commissioning program that successfully transitions
the project to the
client and ensures that all project components and systems
are operational.
While most of the requirements for closeout and commissioning
occur near
the end of a project, Bartlett Cocke General Contractors
does not wait until
we have achieved substantial completion before addressing
these items.
We have created a process that addresses closeout and
commissioning very early in the planning stages of a
project and integrates closeout and
commissioning into the project discussions throughout
the life of a
construction project. Our “Start-to-Finish”
Program takes closeout and
commissioning into consideration from the beginning
of a project during pre-
construction and keeps closeout and commissioning a
critical agenda item
through final completion.
Building owners and managers have become increasingly
concerned
with the efficient operation and maintenance of their
facilities. Bartlett
Cocke General Contractors has developed a total building
commissioning
management plan to assist the owners and design professionals
we
work with achieve, validate and document, that the performance
of the
total building and its systems meets the design needs
and requirements
established. Total building commissioning includes the
checkout and
performance of all building systems and components including
mechanical
systems, electrical systems, life safety, testing and
balancing, and indoor
air quality.
Bartlett Cocke General Contractors strives to closeout
and commission our
projects within 60 days of achieving substantial completion.
We begin the
closeout and commissioning process during pre-construction
and include
the owner and design professionals in the process. This
is a significant
culture shift for the construction industry; which currently
achieves
substantial completion, completes the punch list, submits
operation and
maintenance manuals and turns over as-built drawings
sometime before
the close of the warranty period. |
|



|
|
|
|